CIBC Square at 81 Bay St, Toronto
Client
EllisDon
Solutions Provided
Executive Summary
Developer
Hines, Ivanhoé Cambridge
Builder
EllisDon
Architect
WilkinsonEyre Architects, Adamson Associates Architects, EVOQ Architecture Inc.
Engineering
RJC Engineers, The Mitchell Partnership Inc.
EXACT Scope
- Temperature monitoring for mass concrete elements
- Maturity monitoring of the core to alert the project team when the strength of the concrete is nearing the 16MPa that is required for jacking the self climbing formwork system to the next level
- Formwork pressure monitoring to ensure that the self consolidating concrete (SCC) is not exerting loads higher than what the system was designed for
Check out this awesome timelapse that Urban Toronto just posted of the construction to date!
Read more about it on Urban Toronto.
Time lapse view of CIBC SQUARE rising, images by Forum contributor sikandar
Challenge
Solution
Results
All Case Studies
Learn how our leading-edge hardware and software solutions are helping construction companies around the world build the roads, bridges, tunnels, and buildings of the future.
Innovative Technology. Concrete Results.
Harness the power of real-time data at your fingertips, accelerate timelines, and get more precision in every pour.