CNIB Tower (Edmonton, Alberta)
Executive Summary
EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials.
June 3, 2021
We’ve helped the team accelerate schedule and are now 18 storeys up, looking out to the rest of the city! By using our technology and understanding the concrete mix, projects can get real time strength data to help perform critical activities such as stripping and cycling their formwork which accelerates the project as a whole.
Challenge
Solution
Results