Case Studies

Cast-in-Place
Match
Monitor

The Parks Project Phase 1

Client
Ledcor
Solutions Provided

The Parks project in Edmonton uses Lafarge’s ECOPact low-carbon concrete and digital solutions like SMARTherm and ConcreteDirect, achieving early completion, $600K savings, and 252,600 kg emissions reduction in Phase 1.

Read More
Cast-in-Place
Match
Monitor

The Eglinton LRT: How to Make a Big Impact with a Smaller Carbon Footprint

Client
Metrolinx
Solutions Provided

The Eglinton LRT project used high-volume SCM concrete to reduce emissions, manage heat during curing, and enhance durability, aiming for significant GHG reductions in Canada’s infrastructure projects.

Read More
Cast-in-Place
Match
Monitor

CIBC Square at 81 Bay St, Toronto

Client
EllisDon
Solutions Provided

Hines and Ivanhoé Cambridge, with EllisDon, are using EXACT’s technology to monitor temperature, concrete maturity, and formwork pressure on their project. This ensures the core reaches required strength and maintains safe loads. Urban Toronto shared a timelapse of the progress.

Read More
Cast-in-Place
Match
Monitor

CNIB Tower (Edmonton, Alberta)

Client
EllisDon
Solutions Provided

EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials.

Read More

All Case Studies

Learn how our leading-edge hardware and software solutions are helping construction companies around the world build the roads, bridges, tunnels, and buildings of the future.

Text Link

The Parks Project Phase 1

Client
Ledcor
Solutions Provided

The Parks project in Edmonton uses Lafarge’s ECOPact low-carbon concrete and digital solutions like SMARTherm and ConcreteDirect, achieving early completion, $600K savings, and 252,600 kg emissions reduction in Phase 1.

Read More
Text Link

The Eglinton LRT: How to Make a Big Impact with a Smaller Carbon Footprint

Client
Metrolinx
Solutions Provided

The Eglinton LRT project used high-volume SCM concrete to reduce emissions, manage heat during curing, and enhance durability, aiming for significant GHG reductions in Canada’s infrastructure projects.

Read More
Text Link

CIBC Square at 81 Bay St, Toronto

Client
EllisDon
Solutions Provided

Hines and Ivanhoé Cambridge, with EllisDon, are using EXACT’s technology to monitor temperature, concrete maturity, and formwork pressure on their project. This ensures the core reaches required strength and maintains safe loads. Urban Toronto shared a timelapse of the progress.

Read More
Text Link

CNIB Tower (Edmonton, Alberta)

Client
EllisDon
Solutions Provided

EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials.

Read More
Text Link

Exact Technology in Healthcare

Client
Lafarge
Solutions Provided

An overview of how Exact Technology is transforming the healthcare industry.

Read More
Text Link

Challenges in Adopting Exact Technology

Client
Lafarge
Solutions Provided

An exploration of the challenges organizations face when implementing Exact Technology.

Read More

Innovative Technology. Concrete Results.

Harness the power of real-time data at your fingertips, accelerate timelines, and get more precision in every pour.